HOW TO ASSEMBLE YOUR PUTTBOX™

This quick video shows the full setup from start to finish.

YOUR PUTTBOX™ IS DESIGNED TO ASSEMBLE IN UNDER 30 SECONDS

STEP-BY-STEP ASSEMBLY INSTRUCTIONS

STEP 1

Unfold the PuttBox™

Remove the PuttBox™ from the rubber band and unfold it so the graphics face upward. Lay it flat with the large hole facing you and the small hole facing forward.

STEP 2

Stand up the Side Walls

Fold the two long side panels upward until they stand vertically. These panels form the structure and stability of the PuttBox™.

STEP 3

Lock the Front Wall

Fold the front wall upward (the side with the SMALL hole). Push the side flaps inward so the tabs lock into the slots. This creates a secure, squared front opening.

STEP 4

Lock the Back Wall

Fold the back wall upward (the side with the LARGE hole). Push the tabs into the sidewall slots until they snap cleanly into place. Your PuttBox™ should now feel sturdy and fully formed.

STEP 5 (OPTIONAL)

Use the Ground Tabs for Outdoor Practice

If you’re practicing outside on uneven turf, use the built-in ground tab:
• Pull the tab downward
• Step on it lightly or press it into the surface
This prevents rocking and keeps the PuttBox™ stable.

ASSEMBLY DIAGRAM

For customers who prefer a visual schematic, CLICK HERE for the official assembly layout used during manufacturing.

YOU ARE READY TO PUTT!

Your PuttBox™ is now fully assembled and ready for training:

• Start Line
• Follow-Through Control
• Capture Speed
• Pressure Putting

PuttBox™ putting aid. Start making more putts!

REGISTER YOUR PUTTBOX

Register your PuttBox™ for full access to coaching, challenges, and updates.